TDI Golf and XGD Systems have a longstanding relationship with Wanakah Country Club and most recently performed drainage and restoration services in 2014, 2015, 2016, 2017, and 2018.

Phase I construction, from April and May 2016 included:

  • #12 a par three that needed new tees built, a new fairway and adjacent rough, and new greenside bunkers (we preserved the existing green surface).
  • #14 a par five, restoration of fairway and bunkers.

Phase II construction, from September – November 2016 included:

  • #5 fairway restoration.
  • #8 fairway and fairway bunkers restoration.
  • #17 fairway and green complex restoration (including the green surface, greenside bunker, and adjacent rough).

Phase IV construction, from September – November 2017 included:

  • #11 Fairway Bunkers and Tees.
  • #13 Greens Complex and Tees.